Repackaging Overaward Priority
Fund sources within the Repackaging Overaward Priority grid are listed in their currently configured fund source priority order. Scheduled disbursements are listed first (Schedule shown in the Disb. Action column) and shown in descending order based on their priority number (standard numbering schema with "1" being highest, etc...). Any fund sources with a status of Refund (shown in the Disb. Action column) are listed next. These are listed in numerical priority as well but will continue sequentially from the last Scheduled fund source. For example:
- Priority 1 - Private Loan - Schedule
- Priority 2 - Cash Payment - Schedule
- Priority 3 - PLUS Loan - Schedule
- Priority 4 - Unsubsidized Loan - Schedule
- Priority 5 - Subsidized Loan - Schedule
- Priority 6 - SEOG - Schedule
- Priority 7 - Private Loan - Refund
- Priority 8 - Cash Payment - Refund
- Priority 9 - PLUS Loan - Refund
- Priority 10 - Unsubsidized Loan - Refund
- Priority 11 Subsidized Loan - Refund
- Priority 12 - SEOG - Refund
- Priority 0 - Pell - Schedule
- Priority 0 - Pell - Refund
You can change the current order of the fund sources by modifying the number of a selected fund source in the Priority column. That fund source will automatically move to its new numerical position in the list and the numbers for the other funds underneath it are adjusted accordingly, moving them all one slot lower in the list.
If a new fund source is added after the Repackaging Overaward Priority grid has been saved and that fund source has a Priority value greater than 0, that new fund source appears at the bottom of the grid list the next time the grid is opened. The new fund is listed with a Priority of 0 and you can adjust the priority to move the fund source to its desired spot within the list. You can also copy a selected priority to another campus.
Auto-repackaging will consider two types of overawarding calculations:
-
If the total need-based aid package exceeds the total need-based aid eligibility, the system will apply the overawarding reduction configuration to the student’s need-based aid (as configured per each fund source).
-
Since it is possible for the need-based aid overaward to resolve the total aid packaged overaward, it is possible that no further reductions are required. If the total aid packaged is higher than the cost of attendance, the system will apply the overawarding reduction to all funds as configured in order.
If the total aid is adjusted because the overawarding configuration does not fully resolve the overaward, an exception will be created and routed for the campus to review the next steps by manually reducing aid if needed. REPACKAG0035 exception is thrown when the configurations of Award Level Increase and Repackage Overaward Priority still leave the total aid packaged to exceed the total COA.
Notes:
-
The Automated Awarding Fund Source Rule’s Repackage Action column needs to be configured as B (Increase and Decrease) or D (Decrease) so that the same fund source can be eligible for a reduction due to over awarding.
-
The Automated Budget and Packaging Options configuration for the Award Loan Fee field will determine if the total aid awarded will be based on the gross or net amount of the funds. The Award Loan Fee configured as Yes will use the gross amount of the loans and the Award Loan Fee configured as No will use the net amount of the loans to determine total need-based aid and total aid packaged.
-
Be aware that since the system schedules a refund even though the gross amount of the fund source is not reduced until the refund is posted, it might falsely appear to a user that the overaward is not resolved due to the difference in timing.
-
When a fund source's Automated Awarding Fund Source Priority is reduced to zero, the fund source's Repackaging Overaward Priority for any Scheduled and Refund actions is also automatically reduced to zero. Any fund source with an Awarding Priority of zero and Overawarding Priority of zero is not displayed within Repackaging Overaward Priority.
Prerequisites
You must have:
-
Common - Configuration - View authorization
-
Financial Aid Automation - Configuration - Automated Awarding Fund Source Priority - Edit, Update Awarding Priority, and View authorization
Access Method
Select the Configuration tile > expand Financial Aid > select Automated Awarding Fund Source Priority.
Procedure to Configure Repackaging Overaward Priority
-
Select the Repackaging Overaward Priority tab.
-
Select a Campus. The grid will be populated with the associated records.
-
Review the values of the records in the grid.
Scheduled disbursements are listed first (Schedule in the Disb. Action column) in numerical priority order.
Refunds (Refund in the Disb. Action column) are then listed in numerical priority order, following the last scheduled disbursement.
-
You can edit the Overaward Priority numerical value (1 through 999) in the grid. When you assign a priority value, the previously assigned values are adjusted to maintain the existing sequence order.
Setting the Overaward Priority to zero (0) disables the action on the fund source.
-
You can edit the Award Level Distribution value in the grid by selecting one of the following options:
When the system applies award-level distribution, the system considers any break between terms as:
-
Prior term = Past
-
Next term = Future
-
All Payment Periods (Past, Current & Future)
With this configuration, auto repackaging affects past, current, and future pay periods. This is the default value for all fund sources other than a Pell grant.
-
Current & Future Payment Periods
With this configuration, auto repackaging determines the active (current) pay period and awards funds only for the current and future pay periods. This is the default value for the Pell grant fund source.
-
Future Payment Periods
With this configuration, auto-repackaging determines the current pay period and awards funds only for a future pay period.
When a paid disbursement is eligible for an increased distribution, auto-repackaging will award an additional disbursement for that payment period to account for the increased amount as well as increasing any scheduled disbursements.
-
-
If you need to copy a selected priority to another campus, select Copy Priority in the toolbar and a Copy Priority pop-up appears enabling you to select the desired Campuses. Select the Copy button after your campus selections are made. The following message is displayed: "WARNING: Copied configuration values will override existing configurations." Confirm to copy the configuration.
The system uses the source campus funds that are shared first and then displays the non-shared funds in the grid (if they are originally configured with a number greater than 0 within the Fund Source Priority grid) with a value of 0 in the Priority column. You will need to enter a value in the Priority column to place it in the order you desire (Step 3).
To successfully copy a priority, Repackage process activation must be enabled for the campus(es) being copied to. When the copy is performed, if you opt to repeat the copy process for a campus you already selected and saved, all values will be overwritten. Any prior existing values you copied to the campus are permanently deleted and the new values are inserted.
-
If you want to save and:
-
Continue making changes, select the Save button
-
Close, select the Save & Close button